Sign In | Join Free | My himfr.com
Home > Steel Structure Building >

Ventilation Panel Odm Steel Structure Building , Peb Warehouse Construction

Gnee Steel (tianjin) Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Ventilation Panel Odm Steel Structure Building , Peb Warehouse Construction from wholesalers
     
    Buy cheap Ventilation Panel Odm Steel Structure Building , Peb Warehouse Construction from wholesalers
    • Buy cheap Ventilation Panel Odm Steel Structure Building , Peb Warehouse Construction from wholesalers
    • Buy cheap Ventilation Panel Odm Steel Structure Building , Peb Warehouse Construction from wholesalers
    • Buy cheap Ventilation Panel Odm Steel Structure Building , Peb Warehouse Construction from wholesalers
    • Buy cheap Ventilation Panel Odm Steel Structure Building , Peb Warehouse Construction from wholesalers

    Ventilation Panel Odm Steel Structure Building , Peb Warehouse Construction

    Ask Lasest Price
    Brand Name : Gnee
    Model Number : Steel Structure Building
    Certification : SGS
    Price : Negotiable
    Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
    Supply Ability : 3000 Ton/Tons per Day
    • Product Details
    • Company Profile

    Ventilation Panel Odm Steel Structure Building , Peb Warehouse Construction

    Prefab Steel Structure Warehouse Economical Design Construction Steel Building With Ventilation Panel
    Working for a main contractor and alongside a civil and mechanical engineer contractor, we helped to build a garage and workshop for a regional fire station.


    The main requirement was for areas to be portioned off for battery storage and forklift battery charging. These areas required needed to be well ventilated so louvre doors were used to provide airflow in and out.


    Prefab Steel Structure Warehouse Economical Design Construction Steel Building With Ventilation Panel


    Where battery charging was being done, there was a requirement to control the temperature, to achieve this composite insulated cladding was used to create this area.


    The project had budget requirements, so it was value engineered, working with the main contractor to provide good solutions to fit with their budget.


    Prefab Steel Structure Warehouse Economical Design Construction Steel Building With Ventilation Panel


    Main structure
    Steel Welded H Section

    Purlin

    C Section Channel or Z Section Channel

    Roof Cladding

    Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool Coil

    Wall Cladding

    Sandwich Panel or Corrugated Steel Sheet

    Tie Rod

    Circular Steel Tube

    Brace

    Round Bar

    Column & Transverse Brace

    Angle Steel or H Section Steel or Steel Pipe

    Knee Brace

    Angle Steel

    Roof Gutter

    Color Steel Sheet

    Rainspout

    PVC Pipe

    Door

    Sliding Sandwich Panel Door or Metal Door

    Windows

    PVC/Plastic Steel/Aluminum Alloy Window

    Connecting

    High Strength Bolts

    Packing

    Decided by you, loaded into 1X 40FT GP, 1X20 FT GP, 1X40 FT HQ

    Drawing

    We can make the design and quotation according to your requirements or your drawing

    Panel Material parts(1). External Wall panel: (below is selectable)
    1) 50mm, 75mm or 100mm thickness EPS sandwich panel
    2) 50mm, 75mm or 100mm thickness glass wool sandwich panel
    3) 50mm, 75mm or 100mm thickness Rockwool sandwich panel
    3) 900# Corrugated Galvanized Steel sheet with different Color
    4) Kinds of PVC wall panel.
    (2). Internal Wall panel: (below is selectable)
    1)50mm, 75mm or 100mm thickness EPS sandwich panel
    2) 50mm, 75mm or 100mm thickness glass wool sandwich panel
    3) 50mm, 75mm or 100mm thickness Rockwool sandwich panel
    (3). Roofing panel: (below is selectable)
    1)50mm, 75mm or 100mm thickness EPS sandwich panel
    2) 50mm, 75mm or 100mm thickness glass wool sandwich panel
    3) 50mm, 75mm or 100mm thickness Rockwool sandwich panel
    3)Corrugated Steel Sheet, an insulating layer if need.
    4)Corrugated PVC roof panel.
    (4). Skylight: 820# Glass Fiber Reinforced Plastics (FRP)
    Door and Window(1). External Door ( Rolled up door or Sliding door )
    -1. Over-heat Orbit Sliding Door with double open
    -2. Galvanized steel opening by power-operated Roller Door
    (2). Internal Door:
    50mm Thickness EPS sandwich panel with an aluminum alloy door frame
    (3). Window:
    PVC Window or aluminum alloy window frame with glass.


    Application
    Warehouse, temporary office/building, gymnasia, villa, mobile building, guard booth, wall & roof materials for steel building or structure.


    Quality Ventilation Panel Odm Steel Structure Building , Peb Warehouse Construction for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Gnee Steel (tianjin) Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)